跳至主要内容

博文

目前显示的是标签为“Uncertainty”的博文

Risk Management in Project Networks: An Information Processing View

Read  full  paper  at: http://www.scirp.org/journal/PaperInformation.aspx?PaperID=53869#.VNm4LSzQrzE Author(s)   Leena Pekkinen , Kirsi Aaltonen Affiliation(s) Industrial Engineering and Management, University of Oulu, Oulu, Finland . ABSTRACT Increasingly, projects are executed by networks of organizations. The networked form of organization has many important implications for project risk management. Information processing theories introduce mechanisms for processing information inside organizations as well as among organizations to reduce the uncertainty and equivocality inherently present in international projects. This study aims to examine the risk management practices involved at a project network level through an empirical analysis of one complex large project network executed in a challenging institutional environment. With regard to network level risk management, the paper identifies eight formal information processing m...

Robust Optimization for a Multi-Product Integrated Problem of Planning and Scheduling under Products Uncertainty

Read  full  paper  at: http://www.scirp.org/journal/PaperInformation.aspx?PaperID=53572#.VMnXpizQrzE Author(s)    Mengwen Chen * , Cuiwen Cao Affiliation(s) Key Laboratory of Advanced Control and Optimization for Chemical Processes, Ministry of Education, East China University of Science and Technology, Shanghai, China . ABSTRACT This paper presents robust optimization models for a multi-product integrated problem of planning and scheduling (based on the work of Terrazas-Moreno & Grossmann (2011) [1]) under products prices uncertainty. With the objective of maximizing the total profit in planning time horizon, the planning section determines the amount of each product, each product distributed to each market, and the inventory level in each manufacturing site during each scheduling time period; the scheduling section determines the products sequence, start and end time of each product running in each production site during each schedul...

Feasibility Assay for Measure of Sternocleidomastoid and Platysma Electromyography Signal for Brain-Computer Interface Feedback

Read full paper at: http://www.scirp.org/journal/PaperInformation.aspx?PaperID=51353#.VGVhA2fHRK0 Author(s) Juliet Sánchez Galego , Omar Valle Casas , Alexandre Balbinot Affiliation(s) Electrical Department, Federal University of Rio Grande do Sul, Porto Alegre, Brazil . ABSTRACT A feasibility assay is conducted for electromyography measure in sternocleidomastoid and platysma, tenting to use it on Brain-Computer Interface (BCI) feedback. It is proposed a case of study for four healthy subjects with an average of 35 years old, two females and two males. Methodology proposed includes signal acquisition and processing with feature extraction of RMS, Mean and Variance. The data are acquired with the AD board ...

Epistemological Limits to Scientific Prediction: The Problem of Uncertainty

Read full paper at: http://www.scirp.org/journal/PaperInformation.aspx?PaperID=51169#.VFgp32fHRK0 Author(s)   Amanda Guillan Affiliation(s) Department of Humanities, University of A Coruña, A Coruña, Spain . ABSTRACT A key issue regarding the reliability of scientific prediction is uncertainty, which also affects its possibility as scientific knowledge. Thus, uncertainty is directly related to the epistemological limits of prediction in science. Within this context, this paper considers the obstacles to scientific predictions that are related to uncertainty. The analysis is made according to the twofold character of the limits of science, which is characterized in terms of the “barriers” and the “confin...