Read full paper at:
http://www.scirp.org/journal/PaperInformation.aspx?PaperID=52930#.VKyjFcnQrzE
http://www.scirp.org/journal/PaperInformation.aspx?PaperID=52930#.VKyjFcnQrzE
ABSTRACT
This
research effort compares four sequencing rules intended to smooth
production scheduling for mixed-model production systems in a
Just-in-Time/Lean manufacturing environment (“JIT” hereafter). Each rule
intends to schedule mixed-model production in such a way that
manufacturing flexibility is optimized in terms of system utilization,
units completed, average in-process inventory, average queue length, and
average waiting time. A simulation experiment, where the various
sequencing rules are tested against each other in terms of the above
production measures, shows that three of the sequencing rules
essentially offer the same performance, whereas one of them shows more
variation.
Cite this paper
References
McMullen, P. (2015) JIT Mixed-Model Sequencing Rules: Is There a Best One?. American Journal of Operations Research, 5, 5-29. doi: 10.4236/ajor.2015.51002.
| [1] | Goldratt, E.M. and Cox, J. (1992) The Goal: A Process of Ongoing Improvement. North River Press, North Barrington. |
| [2] | McMullen,
P.R. (1998) JIT Sequencing for Mixed-Model Assembly Lines with Setups
Using Tabu Search. Production Planning & Control, 9, 504-510. http://dx.doi.org/10.1080/095372898233984 |
| [3] | Kanet,
J.J. (1981) Minimizing the Average Deviation of Job Completion Times
About a Common Due Date. Naval Research Logistics Quarterly, 28,
643-651. http://dx.doi.org/10.1002/nav.3800280411 |
| [4] | Garcia-Villoria, A. and Pastor, R. (2013) Minimising Maximum Response Time. Computers & Operations Research, 40, 2314-2321. http://dx.doi.org/10.1016/j.cor.2013.03.014 |
| [5] | Salhi,
S. and Garcia-Villoria, A. (2012) An Adaptive Search for the Response
Time Variability Problem. Journal of the Operational Research Society,
63, 597-605. http://dx.doi.org/10.1057/jors.2011.46 |
| [6] | Hermann, J.W. (2007) Generating Cyclic Fair Sequences Using Aggregation and Stride. The Institute for Systems Research, ISR Technical Report 2007-12. |
| [7] | Miltenburg,
J. (1989) Level Schedules for Mixed-Model Assembly Lines in
Just-in-Time Production Systems. Management Science, 35, 192-207. http://dx.doi.org/10.1287/mnsc.35.2.192 |
| [8] | Kelton, D.W., Sadowski, R.P. and Sturrock, D.T. (2004) Simulation with Arena. 3rd Edition, McGraw-Hill Higher Education, Boston. eww150107lx |
评论
发表评论